Project Feature: Chanhassen Bathroom Remodels | Chanhassen Remodeler

The homeowners of this 1986 Chanhassen home knew it was time for a change.  Their outdated bathrooms needed updating, so they decided to remodel both their master bath and their hallway bathroom at the same time.  In about three weeks time we were able to complete the remodels with amazing results!

The homeowners selected beautiful new tile, Cambria countertops, new vanities, and updated light fixtures.  We were able to custom fit the new cabinets to meet their needs and match the wall cabinet in the hall bath to the style and color of the new vanity.

Both bathrooms were styled with the same design elements (tile, color, vanity), except for the differences in the showers.  The master bath is now home to a stand up shower with a custom made frosted glass shower door, while the hallway bath is suited with a tub and shower setup.

Check out the before & after photos below!  Ready for your own bathroom remodel?  Contact us here at Sass Construction to get the process started!  Serving Chanhassen and the Twin Cities area.

 

Tags: , ,

Leave a Reply

Security Code: